• |本期目錄/Table of Contents|

    [1]張晟熙.地鐵十字組合換乘站廳改造施工的平面布置方案——以長沙萬家麗廣場站廳改造工程為例[J].廈門理工學院學報,2020,(3):62-69.[doi:doi:1019697/jcnki16734432202003011]
     ZHANG Shengxi.A Case Study on Layout Improvement of Interchange Subway Station Halls[J].Journal of JOURNAL OF XIAMEN,2020,(3):62-69.[doi:doi:1019697/jcnki16734432202003011]
    點擊復制

    地鐵十字組合換乘站廳改造施工的平面布置方案 ——以長沙萬家麗廣場站廳改造工程為例(PDF)
    分享到:

    《廈門理工學院學報》[ISSN:1673-4432/CN:35-1289/Z]

    卷:
    期數:
    2020年第3期
    頁碼:
    62-69
    欄目:
    建筑與土木工程
    出版日期:
    2020-06-30

    文章信息/Info

    Title:
    A Case Study on Layout Improvement of Interchange Subway Station Halls
    文章編號:
    16734432(2020)03006208
    作者:
    張晟熙
    (湖南建工集團裝飾工程有限公司,湖南 長沙 410002)
    Author(s):
    ZHANG Shengxi
    (Decoration Engineering, Hunan Construction Group, Changsha 410002,China)
    關鍵詞:
    地鐵十字組合換乘站廳改造施工方案施工組織平面布置長沙地鐵萬家麗廣場站
    Keywords:
    interchange subway station reconstruction scheme construction organization plane layout Changsha Metro Wanjiali Square Station
    分類號:
    TU721;U2314
    DOI:
    doi:1019697/jcnki16734432202003011
    文獻標志碼:
    A
    摘要:
    以長沙地鐵萬家麗廣場站新建5號線和既有2號線的組合換乘站廳改造工程為案例,綜合分析施工和運營同步進行的改造工程所涉及的主要內容,探討地鐵十字型換乘組合站廳改造施工的平面布置方案。研究表明,布置方案應在明確設計難點的基礎上,采用分階段分區域的組織形式,統籌兼顧施工組織流水段劃分、運營客流組織、各階段施工的平面布置,并制定降低運營影響的有效措施。各階段運營區域內的乘客流線是直接影響運營是否正常的關鍵,方案設計時應該統籌兼顧各階段運營區域內的安檢、閘機、售票、無障礙設施等;圍擋隔墻的設計定位應考慮施工所需的組織空間和臨時消防通道,隔墻圍擋應采取密封和降噪措施。實踐驗證了該方案的可行性和有效性。
    Abstract:
    Taking Interchange Wanjiali Square Station of Changsha Metro as an example when a new L5 meets the established L2, this paper analyzes the layout scheme for the reconstruction undertaken amid the metro operation for the cross interchange station hall.The research shows that the layout scheme should be best organized and implemented in phases and regions, taking consideration of workflow division, passenger flow, plane layout of phased construction, and measures to reduce the impact of operation. The passenger flow line in the phased operation areas is key to normal operation in construction, its scheme should therefore take into account the security inspection, gate entry, ticketing, barrier free facilities and the like in each phase of construction, and enclosure should allow space for construction and the temporary fire passage with measures to ensure its sealing and noise reducing effect.The feasibility and effectiveness of the scheme are verified by practice.

    參考文獻/References:

    [1] 權楊迪,馮小杰,劉夏暉,等.北大街地鐵換乘站客流組織優化調查研究[J].智能城市,2019,5(17):1215. [2] 李正濤,曹保利.新建地鐵車站換乘接駁施工技術及風險控制研究[J].工程建設與設計,2019(10):6770. [3] 余盼晴.北京地鐵15號線大屯路東站換乘改造分析[J].鐵道建筑技術,2018(6):7276. [4] 宋冰晶.對地鐵標準站進行換乘改造的思考[J].鐵道標準設計,2017(6):14. [5] 霍揚.基于客流模擬的沈陽地鐵1、2號線換乘站改造設計研究[J].鐵道標準設計,2018(7):148153. [6] 朱偉.淺析流水施工中的各項參數[J/OL].城市建設理論研究(電子版),2013(20).(20131009)[20200110].http://d.wanfangdata.com.cn/periodical/csjsllyj201320991.

    相似文獻/References:

    備注/Memo

    備注/Memo:
    收稿日期:20200203修回日期:20200611 〖BFQ〗〖HT5”H〗基金項目:〖HT5”SS〗〖BFQ〗〖ZK(〗國家自然科學基金項目(61903315);福建省自然科學基金項目(2019J01869,2019J05124);廈門市留學人員科研項目(廈人社〔2018〕310號,廈人社〔2019〕232號);福建省中青年教師教育科研項目(JT180426,JT180425);廈門理工學院高層次人才項目(YKJ17013R,YKJ17012R);廈門理工學院“科研攀登計劃”科研項目(XPDKQ18017,XPDKQ18018)〖ZK)〗通信作者:張晟熙,男,工程師,研究方向為施工技術和建筑裝飾,Email:289556806@qqcom。 引文格式:張晟熙地鐵十字組合換乘站廳改造施工的平面布置方案:以長沙萬家麗廣場站廳改造工程為例[J]廈門理工學院學報,2020,28(3):6269 Citation:ZHANG S X.A case study on layout improvement of interchange subway station halls[J].Journal of Xiamen University of Technology,2020,28(3):6269(in Chinese)
    更新日期/Last Update:
    大佬彩票平台